Bathroom advice for High Wycombe homes
How long does a bathroom refit take, and how do you live through it?
The work itself worries people less than the days without a bathroom. If you have one bath and one toilet for the whole family, the question is simple: how long?
Here is what the published guides say, what each day usually holds and what you can do to keep the job short.
The published timings
The new bathroom cost guide gives about five days for a budget bathroom, six to eight for a standard one and up to fifteen for a premium one. It quotes one fitter as saying a week is a good place to begin for a like-for-like room.
The same site's renovation guide is more cautious. It allows one to two weeks for a like-for-like replacement, two to four weeks for a full renovation and three to six weeks where the layout changes.
Smaller jobs are far quicker. Its guides give two to four hours for swapping a bath, one to three days for turning a bath into a walk-in shower and four to seven days for a wet room.
A standard refit, day by day
Every job differs, but a family bathroom with the layout kept the same often runs something like this.
- Day 1. Floors and stairs covered. Old suite, tiles and flooring out. The toilet is often refitted loosely at the end of the day so the house is not without one.
- Day 2. Pipes altered and capped. Any electrical first fix. Floor repaired where needed.
- Day 3. Walls boarded and the shower area waterproofed. Bath or tray set in place.
- Days 4 and 5. Wall tiling, then floor tiling.
- Day 6. Grouting. Basin, toilet, shower, towel rail and fan fitted and connected.
- Day 7. Sealing, testing, snagging and cleaning.
Sealant then needs time to cure before the shower is used. Ask for the exact hour you can turn it on.
What stretches a job
- Missing or damaged goods. A cracked tray discovered on day three can cost a week while a new one is ordered. Check every box when it arrives.
- Hidden damage. A rotten floor or crumbling plaster adds a day or two.
- Drying times. New plaster and levelling compound have to dry before tiles go on. This cannot be hurried.
- Waiting for another trade. If the electrician is not booked for the right day, everything behind them slips.
- Changes of mind. Moving the basin after the pipes are in is the costliest change of mind.
- Access. On High Wycombe's steep, narrow roads a skip may need a permit to stand on the highway, and that takes days to arrange. Ask about it early.
Most of these are settled before day one. That is why planning before day one shortens the job.
Living in the house while it happens
You can nearly always stay at home. A little preparation makes it bearable.
- Agree that the toilet will work each evening, and which days it truly cannot
- Line up a shower elsewhere: a relative nearby, a gym, or the leisure centre
- Clear the landing and the route from the front door, and expect dust sheets on the stairs
- Move anything fragile from the room below, in case of knocks to the ceiling
- Keep a kettle, a bowl and towels in one bedroom as a wash station for the children
- Plan the job outside exam weeks, new babies and house guests if you can
If you have a second toilet, the whole thing is far easier. If you do not, it may be worth fitting one first. See en suites and cloakrooms in High Wycombe.
Questions to ask about timing
Ask these before you agree a date, and write the answers down.
- What day do you begin, and what day do you expect to finish?
- Will you be here every day until it is done?
- Is everything ordered, and when does it arrive?
- Who else is coming, and on which days?
- What would make the job run over, and how will you tell me?
A fitter who answers these easily has a plan. Our guide to choosing a bathroom fitter has more on what to check, and the page on bathroom installation lists what a full refit includes.
Common questions
Can we stay in the house during a bathroom refit?
Yes, almost always. The water is off for parts of some days and the bathroom is out of use, but the kitchen, heating and toilet can normally be kept going. Families with one bathroom should agree a plan for the toilet and for washing before work begins.
What is the quickest way to get a new bathroom?
Keep the layout as it is, choose fittings that are in stock, have everything delivered and checked before the first day, and make your decisions once. A bath and shower over it goes in faster than a separate bath and enclosure, and wall panels are quicker than tiles.
Ask for a start date for your refit
Fitters fill their calendars weeks ahead, and plenty of households want the work finished before Christmas or the summer holidays. If you want the work done by a set time, the planning has to begin well before it. A leak that is left while you wait does not wait with you.
Say what the bathroom needs, give the month you have in mind and name your part of High Wycombe. Sending it is free.